Viewing Annual Projected Costs

Cost Allocation > Projection > Current Month Projected Cost

 

You can view annual projected costs based on previous spending trends. 

 

To view annual projected costs:

  1. From Cost Allocation, Projection, select Annual Projected Costs.

  2. In Group, select the items for which to view projected costs.

  3. In Filter, select a specific item for which to show results or select Show all items in the groups.

  4. In Extended Filter, select the whether you want to view a consolidated policy, standalone or both.

  5. View the current annual projected cost summary at the top right of the report.
    • Hover over a line item to see the annual project cost for that item.
    • Right click on a column to drill up or down into the item.